Standby Generator Maintenance Schedule

Galleries

Information

Procedures

Systems

 

Select this symbol to return to the top of this Menu. è    Δ

Go to The Generator Operation Manual

Go Back to the Electrical System

Page File Information

 

System Component or Procedure

See Section

Procedure

 

Frequency

Visually Inspect

Check

Change

Clean

Test

Fuel

 

 

 

 

 

 

 

Flexible lines and connections

 

X

 

R

 

 

Quarterly

Main tank supply level

 

 

X

 

 

 

Weekly

Fuel piping

 

X

 

 

 

 

Yearly

Lubrication

4.2

 

 

 

 

 

 

Oil level

 

X

X

 

 

 

hours or before use

Crankcase breather hose

 

X

 

 

 

 

Yearly or 500 hours

Change oil

 

 

 

X

 

 

Yearly or 100 hours

Replace filter

 

 

 

X

 

 

Yearly or 200 hours

Cooling

4.5

 

 

 

 

 

 

Air ducts, louvers

 

 

X

 

X

 

Yearly

Exhaust Line

4.6

 

 

 

 

 

 

Δ

 

 

 

 

 

 

 

Leakage

 

X

X

 

 

 

Weekly

Insulation, fire hazards

 

X

 

 

 

 

Yearly

Obstructions or combustible materials near exhaust outlet

 

X

 

 

 

 

Weekly

Electrical System

4.8

 

 

 

 

 

 

Check battery charger operation, charge rate

 

X

 

 

 

 

Monthly

Remove corrosion, clean and dry battery and rack

 

X

 

 

X

 

Yearly

Clean and tighten battery terminals and inspect boots

 

X

X

 

 

 

Yearly

Battery electrolyte level and specific gravity *

 

 

X

 

 

 

Yearly

AC Electrical System

 

 

 

 

 

 

 

Tighten control and power wiring connections

 

 

X

 

 

 

Yearly

Remote control system, if equipped

 

 

 

 

 

X

Monthly

Visible wear or damage

 

X

 

 

 

 

Quarterly

Wire abrasions where subject to motion

 

X

X

 

 

 

Six Months

Wire-cable insulation condition

 

X

 

 

 

 

Years or 500 hours

Δ

 

 

 

 

 

 

 

Engine and Mounting

 

 

 

 

 

 

 

Visible wear or damage

 

X

 

 

 

 

Weekly

Air cleaner service

4.4

 

150

300

 

 

 

Spark plugs

4.3

 

 

X

 

 

Yearly or 300 hours

Replace stepper motor coupling and bushing

 

 

 

D

 

 

hours

Generator

 

 

 

 

 

 

 

Visible wear or damage

 

X

 

 

 

 

Quarterly

Exercise generator set

 

 

 

 

 

X

Weekly

Brushes and collector ring

 

D

 

 

D

 

Yearly or 300 hours

Measure and record resistance readings of windings with insulation tester (Megger , with SCR assembly or rectifier and load leads disconnected) *

 

 

 

 

 

D

Years

General Condition of Equipment

 

 

 

 

 

 

 

Evidence of vibration, leakage, excessive noise, temperature, or deterioration

 

X

X

 

X

 

Weekly

Interior of sound enclosure

 

X

 

 

X

 

Quarterly

*      Not necessary for maintenance-free batteries.                                   X     Action

Service more frequently under extremely dusty/dirty conditions.              D              Authorized distributor/dealer only Megger             is a registered trademark of Biddle Instruments.          R              Replace as necessary

 

 

 

Δ

 

 